Why is the Bridge Closed?
The Ramsey Swing Bridge is closed for vehicles because it was found to be damaged. After checking, engineers said it needs more time for repairs, so it will stay closed longer.
How Long Will It Be Closed?
At first, it was going to be closed for 1 month. Now, it will stay closed until mid-summer so repairs can be done properly.

Can People Still Walk on It?
Yes, people can still walk across the bridge. Only cars and other vehicles are not allowed.
Why Is This Bridge Special?
The bridge was built in the 1800s and is from the Victorian era. It is old and important, and many people on the Isle of Man care about it.

What Is Being Done?
The Infrastructure Department is working to fix the bridge. They will:
-
Repair the surface
-
Make the structure strong
-
Make sure the bridge is safe
There is no exact reopening date yet, but they are trying to finish the work as soon as possible.